Download Oil Field HandyCalc (Lite) APK latest version Free for Android
Version | 1.6 |
Update | 8 years ago |
Size | 1.68 MB (1,759,003 bytes) |
Developer | Saify Solutions |
Category | Apps, Productivity |
Package Name | com.SaifySolutions.OilField |
OS | 2.2 and up |
Oil Field HandyCalc (Lite) APPLICATION description
Oilfield Handy aims to ease the life of Oilfield personnel and Petroleum, Mud Engineers by providing various on-hand calculations. It is meant for Engineers involved in Oil and Gas exploration and Drilling. This application is an essential tool out in the Oilfield. Oil & Gas Calculations. Export your Calculation Results on Email or share with colleagues. Please email us on support@saifysolutions.org, for clarifications or corrections.
iPhone/iPad app link : https://itunes.apple.com/us/app/oilfield-handycalc/id869735548?ls=1&mt=8
Drill String Volume in bbls
Annular Volume in bbls
Strokes - Surface to Bit
Strokes - Bit to surface or “Bottoms Up”
Total Stokes - Kelly to Shaker
Slug Calculation - Length of DRY Pipe
Slug Weight Calculation - Length of DRY Pipe
Accumulator Capacity - Usable Volume Per Bottle
Control Drilling - Maximum Drilling Rate feet per hour
Bulk Density of Cuttings (Using Mud Balance)
Drill String Design (Limitations)
Ton-Mile (TM) Calculations
Cementing Calculations
Weighted Cement Calculations
Calculations for the Number of Sacks of Cement Required
Calculations for the Number of Feet to Be Cemented
Setting a Balanced Cement Plug
Increase Oil/Water Ratio
Decrease Oil/Water Ratio
Hydraulicing Casing
Depth of a Washout
Lost Returns - Loss of Overbalance
Stuck Pipe Calculations
Calculations Required for Spotting Pills
Pressure Required to Break Circulation
iPhone/iPad app link : https://itunes.apple.com/us/app/oilfield-handycalc/id869735548?ls=1&mt=8
Drill String Volume in bbls
Annular Volume in bbls
Strokes - Surface to Bit
Strokes - Bit to surface or “Bottoms Up”
Total Stokes - Kelly to Shaker
Slug Calculation - Length of DRY Pipe
Slug Weight Calculation - Length of DRY Pipe
Accumulator Capacity - Usable Volume Per Bottle
Control Drilling - Maximum Drilling Rate feet per hour
Bulk Density of Cuttings (Using Mud Balance)
Drill String Design (Limitations)
Ton-Mile (TM) Calculations
Cementing Calculations
Weighted Cement Calculations
Calculations for the Number of Sacks of Cement Required
Calculations for the Number of Feet to Be Cemented
Setting a Balanced Cement Plug
Increase Oil/Water Ratio
Decrease Oil/Water Ratio
Hydraulicing Casing
Depth of a Washout
Lost Returns - Loss of Overbalance
Stuck Pipe Calculations
Calculations Required for Spotting Pills
Pressure Required to Break Circulation