Download Earned Value LITE APK latest version Free for Android
Version | 1.0.5 |
Update | 8 years ago |
Size | 9.44 MB (9,897,225 bytes) |
Developer | Octigo |
Category | Apps, Education |
Package Name | pl.evm |
OS | 4.0 and up |
Earned Value LITE APPLICATION description
More than 50 articles, 19 lessons, 70 test questions, 70 pictures. Easy to learn manual on Earned Value Method.
NEW!
Innovative competence tree feature leading you through lessons step by step!
Statistics measuring your performance over time and by competences!
A unique educational application that provides all the knowledge about Earned Value Analysis needed to pass the exam on project management IPMA level C and D, PMP, and PRINCE 2 Foundation and allows you to test it thoroughly. It is also covered by some MBA and post degree studies.
Knowledge is divided into small, easily to read components. You can plan your study and tests, where and when you need it: on the bus, at a boring meeting, watching TV, in a traffic jam. In addition, we have prepared several lessons that group articles, questions and tests controls in a logical sequence on a given topic.
Your progress is measured points of knowledge. Do you know where you are and what you are missing. Collect up to 500 points of knowledge. You lack the perseverance to learn? With our application you will not even notice when you have mastered all the knowledge about EVM.
Convenient user interface provides pleasant reading. Zoom, scroll, search, add to favorites, and more.
This is LITE release! It is still being updated with content.
Main features:
** Knowledge of Earned Value Method
** You learn where you want, when you want
** The logical structure of lessons divided into thematic categories
** Continuous updates of articles, lessons and tests available automatically from your smartphone or tablet
** A revolutionary approach to learning: reading, verification of acquired knowledge, testing
** Lessons, articles and tests prepared by certified PgMP, PMP, PRINCE2 holders
** Automatic synchronization of content directly to your smartphone or tablet, but you do not have to be connected to the Internet to read the downloaded content
** Full-text search of all the content
** Knowledge divided into categories
The aim is to fully cover the competence of the project manager listed in the IPMA NCB of EVA. Current state - 60% of planned content.
Users of this version of the application Octigo - EVM have the right to a free and perpetual download of current content from our server.
Disclaimer:
Octigo, the publisher of this product, is not affiiliated with by any organization. All organizational names are trademarks of Their respective owners. The content of the application might include inaccuracies or typographical errors, for Which the owner can not be held liable.
Help Us Improve
We value your feedback - please share your feedback with us to make our apps better. If you have any topic which you want us to cover in future apps, write to us at [email protected]
NEW!
Innovative competence tree feature leading you through lessons step by step!
Statistics measuring your performance over time and by competences!
A unique educational application that provides all the knowledge about Earned Value Analysis needed to pass the exam on project management IPMA level C and D, PMP, and PRINCE 2 Foundation and allows you to test it thoroughly. It is also covered by some MBA and post degree studies.
Knowledge is divided into small, easily to read components. You can plan your study and tests, where and when you need it: on the bus, at a boring meeting, watching TV, in a traffic jam. In addition, we have prepared several lessons that group articles, questions and tests controls in a logical sequence on a given topic.
Your progress is measured points of knowledge. Do you know where you are and what you are missing. Collect up to 500 points of knowledge. You lack the perseverance to learn? With our application you will not even notice when you have mastered all the knowledge about EVM.
Convenient user interface provides pleasant reading. Zoom, scroll, search, add to favorites, and more.
This is LITE release! It is still being updated with content.
Main features:
** Knowledge of Earned Value Method
** You learn where you want, when you want
** The logical structure of lessons divided into thematic categories
** Continuous updates of articles, lessons and tests available automatically from your smartphone or tablet
** A revolutionary approach to learning: reading, verification of acquired knowledge, testing
** Lessons, articles and tests prepared by certified PgMP, PMP, PRINCE2 holders
** Automatic synchronization of content directly to your smartphone or tablet, but you do not have to be connected to the Internet to read the downloaded content
** Full-text search of all the content
** Knowledge divided into categories
The aim is to fully cover the competence of the project manager listed in the IPMA NCB of EVA. Current state - 60% of planned content.
Users of this version of the application Octigo - EVM have the right to a free and perpetual download of current content from our server.
Disclaimer:
Octigo, the publisher of this product, is not affiiliated with by any organization. All organizational names are trademarks of Their respective owners. The content of the application might include inaccuracies or typographical errors, for Which the owner can not be held liable.
Help Us Improve
We value your feedback - please share your feedback with us to make our apps better. If you have any topic which you want us to cover in future apps, write to us at [email protected]
↓ Read more