EAV Timetable Circumvesuviana icon

EAV Timetable Circumvesuviana

★★★★★
★★★★★
(0.00/5)

1.1.4Free3 years ago

Download EAV Timetable Circumvesuviana APK latest version Free for Android

Version 1.1.4
Update
Size 5.46 MB (5,728,040 bytes)
Developer Giuseppe Romano
Category Apps, Travel & Local
Package Name com.aiuspaktyn.circumvesuviana
OS

EAV Timetable Circumvesuviana APPLICATION description

Circumvesuviana, Cumana & Circumflegrea: Find your way with the italian train schedule.

Alerts in case of strike.

The data source is: http://www.eavsrl.it

Circumvesuviana is a railway company operating services in the East of the Naples metropolitan area. Electrically powered throughout, the system uses the narrow gauge of 950 mm (3 ft 1 3/8 in) and operates 142 km (88 mi) of route on six lines. It is entirely separate from other national and regional railway lines. It has 96 stations with an average interstation distance of 1.5 km (0.9 mi).

The Circumvesuviana railway service covers a wide catchment area of over 2 million people, distributed in 47 municipalities, including Scafati, San Valentino Torio and Sarno in the province of Salerno and Avella and Baiano in the province of Avellino. The network forms an important commercial artery, and provides services to the important tourist destinations of Pompeii and Herculaneum.

All routes start from the Napoli Porta Nolana terminus near the Porta Nolana, and pass through Napoli Garibaldi station before splitting into several branches to towns in the province. A journey along the entirety of the longest route, the 47 km (29 mi) from Naples to Sorrento, takes about one hour.

Napoli - Nola - Baiano
Napoli - Ottaviano - Sarno
Napoli - Pompei - Poggiomarino
Napoli - Botteghelle - San Giorgio a Cremano
Torre Annunziata - Sorrento
Pomigliano d'Arco - Acerra

On 27 December 2012 the company was absorbed by the Ente Autonomo Volturno.

The network uses two types of rolling stock, both electrically powered: FE220 units, and ETR211 "Metrostar" articulated trains. Power is supplied by overhead catenery and the train motors can generate up to 500 kW (670 hp) of power.

Unofficial!

This application is in no way affiliated with © Ente Autonomo Volturno - EAV SRL.

No copyright infringement intended.
↓ Read more
EAV Timetable Circumvesuviana screen 1 EAV Timetable Circumvesuviana screen 2 EAV Timetable Circumvesuviana screen 3 EAV Timetable Circumvesuviana screen 4 EAV Timetable Circumvesuviana screen 5 EAV Timetable Circumvesuviana screen 6 EAV Timetable Circumvesuviana screen 7 EAV Timetable Circumvesuviana screen 8 EAV Timetable Circumvesuviana screen 9

Old versions

Version Size Update
⇢ 1.0.6 (1 variants) ↓ 3.54 MB ◴ 6 years ago
⇢ 1.0.5 (1 variants) ↓ 3.60 MB ◴ 6 years ago
⇢ 1.0.4 (1 variants) ↓ 2.98 MB ◴ 6 years ago